Hello,
I started a fairly aggressive flagstone coping restore / replace last year and I am close to being done now. As part of that process some of the pebbletec below the coping was delaminated. As well the person who repaired 2-3" pebbletec below the coping did a terrible job as he did not use pebbletec and it did not match what so ever.
So I am in process of removing pebbletec 3-4" down below the coping and had plans to replace with Pebbletec. But at this juncture I am thinking it would look nicer with waterline tile.
Looking for opinions if I did only 3" deep vs 6" which seems to be the minimum standard. I could use the 1" multiple or 3" tiles. It might look "stupid" with only the 3" is my concern. Thoughts?
I started a fairly aggressive flagstone coping restore / replace last year and I am close to being done now. As part of that process some of the pebbletec below the coping was delaminated. As well the person who repaired 2-3" pebbletec below the coping did a terrible job as he did not use pebbletec and it did not match what so ever.
So I am in process of removing pebbletec 3-4" down below the coping and had plans to replace with Pebbletec. But at this juncture I am thinking it would look nicer with waterline tile.
Looking for opinions if I did only 3" deep vs 6" which seems to be the minimum standard. I could use the 1" multiple or 3" tiles. It might look "stupid" with only the 3" is my concern. Thoughts?