We just had a 24'x52" above ground pool installed. It has a 1.5 hp 2 speed pump, 150sqft cartridge filter, and an Intex SWG with O3 generator. The pool installer told us to fill the pool, run the pump for 48 hours then take a water sample to the local pool store and they would tell me what I needed to add to the water to get the chlorine right. He said we needed to do this before we added any salt for the SWG. After lurking on here for a couple of weeks I think I should stay away from the pool store. I have a TF-100 test kit on the way but the pool came with a small test kit that I'm hoping I can get away with until the TF-100 gets here. Do I really need to run the pump for 2 days before I do anything? Do I need to get the chlorine up before I add any salt? The pool also came with a chemical starter kit that has (2) 1lb bags of Fast Shock,(1) 1 pint bottle of Algaecide 50%, and (1) 1 pint bottle of Clarifier. Is it okay to use the shock to bring the chlorine up before I add the salt? I just want to make sure I get this new pool off on the right start.
Thanks.
Thanks.