Re: New AGP Project thread
Really? Wow. That was a guess based on what I read online. lol. Do I need to make the ring around the pool as well? I can do all that while the pool fills overnight on the first day. they won't backfill the sidewalls till day 2. So, I need some copper wire and the metal pipe to go inline with the pvc. Cool.
Really? Wow. That was a guess based on what I read online. lol. Do I need to make the ring around the pool as well? I can do all that while the pool fills overnight on the first day. they won't backfill the sidewalls till day 2. So, I need some copper wire and the metal pipe to go inline with the pvc. Cool.