New Fiberglass Install

Thanks! They may be moving a little too fast. The retaining wall, while up, still needs to pass inspection. Also, they started the patio before the inspector could do the bonding inspection. Apparently, it just means they need an electrical continuity test to pass. All should be taken care of by the PB though.
 
Great looking Pool! RPS did mine as well about 8 years ago. If your experience is like mine they will stand behind their work 100000%. We have had on and off coping (poured and stamped concrete) issues since year 3. They have attempted to keep us happy but this year at opening it was worse than ever. They are going to do a full coping replacement at no cost to me in the fall. Tremendous service by Jason, Jim and the rest out there.

I am going to take that opportunity to have tile installed, can you send me a photo of yours? Also, if they broke out pricing would you mind sharing in a roundabout way what that cost was - I just want to pre-prepare myself for the bill.
 
Winger, here are some pictures. It is glass tile called fusion royal blue.
The catalog can be found at nptpool.com. Good to hear that they stand behind their work. That seems to be a rarity these days.
 

Attachments

  • 494EDB2C-9D03-4E15-A9BD-9E96159434DC.jpg
    494EDB2C-9D03-4E15-A9BD-9E96159434DC.jpg
    99.1 KB · Views: 107
  • B3D5CCA4-6F07-449D-928A-D427A317DFD3.jpg
    B3D5CCA4-6F07-449D-928A-D427A317DFD3.jpg
    81.8 KB · Views: 106
  • C6A97E49-FAB5-4FCB-92A9-E76DFE58858C.jpg
    C6A97E49-FAB5-4FCB-92A9-E76DFE58858C.jpg
    89.5 KB · Views: 104

Enjoying this content?

Support TFP with a donation.

Give Support
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.