Hey all!
First of all thank you for all the help.
I've recently purchased my first home and inherited a pool.
I have been trying to locate a suction side air leak and have found it. it is (look at picture) on the bottom of the right valve.
So I am assuming that I will have to replace that valve. I dont feel very confident about the rest of the plumbing so I was thinking of replacing all the suction side plumbing.
The question is... I don't want to mess it up. It seems to me I have limited length of PVC pipe and don't want to cut too much and then have to break up the concrete to get a good fitting. Where should I cut?
I was also thinking of replacing the 2 valves with just 1 Jandy 3 way valve.
Not sure where to cut before the pump though.. don't want to mess up its connection. Any advice would be appreciated!
First of all thank you for all the help.
I've recently purchased my first home and inherited a pool.
I have been trying to locate a suction side air leak and have found it. it is (look at picture) on the bottom of the right valve.
So I am assuming that I will have to replace that valve. I dont feel very confident about the rest of the plumbing so I was thinking of replacing all the suction side plumbing.
The question is... I don't want to mess it up. It seems to me I have limited length of PVC pipe and don't want to cut too much and then have to break up the concrete to get a good fitting. Where should I cut?
I was also thinking of replacing the 2 valves with just 1 Jandy 3 way valve.
Not sure where to cut before the pump though.. don't want to mess up its connection. Any advice would be appreciated!