Got the most of the walls up over the weekend and leveled, need to get them anchored and do final leveling and squaring of them this week. I left one side open in the shallow end to give room for my excavator to come and re-dig the deep end. My plan is to get my plumbing done around the pool and roughed in around the pad area, then have the collar poured around the 3 sides of the pool, I am then going to use the excavated base to backfill compacting every 4-6". Once the deep end is re-dug I will put up the last wall panel and mix and pour the collar on the last wall.
I am going to do a final diagram showing my exact equipment layout, but these questions just came up.
1. Auto vacuums, admittedly I don't know much about them, I was just going to use my skimmer and attach vacuum hose to that. Should I plumb a line for an auto vacuum, and if so what does that look like?
2. My spillover spa has the following recommended plumbing diagram. I only plan on using my VSP, but am wondering if I should run plumbing lines for the Blower and therapy pump? Is this something I could add later if I had the lines run? Any problem with having these lines capped off at my plumbing pad? Is it even worth doing?
I am going to do a final diagram showing my exact equipment layout, but these questions just came up.
1. Auto vacuums, admittedly I don't know much about them, I was just going to use my skimmer and attach vacuum hose to that. Should I plumb a line for an auto vacuum, and if so what does that look like?
2. My spillover spa has the following recommended plumbing diagram. I only plan on using my VSP, but am wondering if I should run plumbing lines for the Blower and therapy pump? Is this something I could add later if I had the lines run? Any problem with having these lines capped off at my plumbing pad? Is it even worth doing?