All,
I am considering pour in place decking/coping. My last pool had that, but did not use the foam forms. It turned out not that great.
This time, I plan to use Stegmeier forms.
On my last pool, the deck joints were sawed in after the pour. There was some minor cracking, but nothing too bad.
This time, I am thinking of doing a salt finish concrete deck, that will be scored in a 24"x24" diamond pattern.
Do you all think I can get by with only scoring the concrete?
I remember older pools always had those plastic joints all over the place.
Thanks
Sent from my iPhone using Tapatalk
I am considering pour in place decking/coping. My last pool had that, but did not use the foam forms. It turned out not that great.
This time, I plan to use Stegmeier forms.
On my last pool, the deck joints were sawed in after the pour. There was some minor cracking, but nothing too bad.
This time, I am thinking of doing a salt finish concrete deck, that will be scored in a 24"x24" diamond pattern.
Do you all think I can get by with only scoring the concrete?
I remember older pools always had those plastic joints all over the place.
Thanks
Sent from my iPhone using Tapatalk