Finally time I started my own thread here instead of lurking. I appreciate all I've learned thus far, please join me in my quest now.
Signing the contract in a couple weeks, here's the first sketch. We've already decided to add pebble sheen, LED lighting (changing the light facing the house in sketch to face away from the house), and considering adding a raised wall in the back with shears.
Here are the specs. Please let me know if you see anything off.
Signing the contract in a couple weeks, here's the first sketch. We've already decided to add pebble sheen, LED lighting (changing the light facing the house in sketch to face away from the house), and considering adding a raised wall in the back with shears.
Here are the specs. Please let me know if you see anything off.
AREA | 390 SQ. FT. | ||
SIZE | 18' X 32' 6" | ||
PERIMETER | 90 | ||
DEPTH | 3' 1/2 -5-4 | ||
STEEL SCHEDULE | 8" ON CENTER | ||
PIPING | SCHEDULE 40 PVC | ||
STEPS | PER PLAN | ||
PERMITS | N/A | ||
LIGHTS | 1- 500 WATT LIGHT IN POOL Changing to 1 or 2 LED | ||
1- 100 WATT LIGHT IN SPA Changing to LED | |||
PUMP | 2 HP PUMP - Variable Speed | ||
FILTER | 420 SQ. FT. CARTRIDGE FILTER | ||
HEATER | 400,000 BTU'S | ||
CHLORINATOR | 320 RAINBOW | ||
CLEANER | 280 POLARIS | ||
BOOSTER PUMP | 3/4 HP | ||
BLOWER | 1 1/2 HP QT BLOWER | ||
MAIN DRAINS | 2 IN POOL / 2 IN SPA | ||
SKIMMERS | 2 | ||
RETURNS | 6 IN POOL /6 JETS IN SPA | ||
TILE | TILE OF CHOICE | ||
COPING | FLAGSTONE | ||
INTERIOR FINISH | PEBBLESHEEN | ||
DECKING | 750 SQ FT OF Spray Deck | ||
AREA DRAINS | 4" RUN TO STREET | ||
EQUIPMENT PAD | 3' X 8' | ||
BENCHES | 2-1 W/ STEP | ||
SPA | 7' ROUND 12" RAISED | ||
CLEANING EQUIPMENT | 4 AND 1 TEST KIT, START UP CHEMICALS, | ||
BRUSH, POLES, NET, HOSE, VAC HEAD, ETC. | |||
ELECTRIC | ALL INCLUDED | ||
***FREEZE PROTECTOR | |||
FEATURES | MULTI-LEVEL SEATING IN SPA | ||
5' X 6' TANNING LEDGE |