Tomorrow is finally the day I've been waiting for. The contractor and my pool will be coming out. They said it will take the better part of one day to complete the build. I'll be posting throughout the day tomorrow to show progress. For now ill be showing some Before pictures. Also went to Wal-Mart today and loaded up on the essentials.
The pool comes with a 2 foot deck around. After they are done, I will make additions to my deck to wrap it around the pool to have one large deck. The pool will go from a lil past the gazebo (towards neighbors house), to where the post is before it goes towards the house (near the double doors). If that makes any sense .
And the view from the deck
If you look close enough you can see 4 sticks in the ground (that is the outline of the pool)
Ready to rock N' roll. Everything minus the Listerine and hair product, those were for my wife but I digress.
The pool comes with a 2 foot deck around. After they are done, I will make additions to my deck to wrap it around the pool to have one large deck. The pool will go from a lil past the gazebo (towards neighbors house), to where the post is before it goes towards the house (near the double doors). If that makes any sense .
And the view from the deck
If you look close enough you can see 4 sticks in the ground (that is the outline of the pool)
Ready to rock N' roll. Everything minus the Listerine and hair product, those were for my wife but I digress.