I wanted to get some of the electrical work out of the way while waiting for pool instal.
How is this looking?
-100amp sub panel
-1” schedule 40 conduit (filled to 39.7% capacity). 20’ run.
-#3 thhn for hot1, hot2, and neutral, #6 ground
-Neutral and ground bus separated at sub
-Box bonded to...