Search results

  1. jszotkie

    plaster on new pool-is this how it should look?

    Plastered my pool on Saturday 4/13/19. Pool was completely full on Monday 4/15/19. I called the PB about start -up so I could start brushing pool, as they recommend. I was told the project manager would call me to set up a time. He finally came out on 5/1/19. My pool sat for 2 weeks with no...
  2. jszotkie

    Actual size of freeform pool

    Thanks for the response . On my pool I get 36 ' for the length, but the highest measurement I get for width is 17' 3".
  3. jszotkie

    Actual size of freeform pool

    The longest length is 36' located exactly where it shows on the pool layout diagram. The largest measurement anywhere for width is 17'3" When I measure the width on the pool layout, the shallow end is 18' and the deep end is 16' The actual measurement between the hooks in the walls for the...
  4. jszotkie

    Actual size of freeform pool

    The longest length is 36' located exactly where it shows on the pool layout diagram. The largest measurement anywhere for width is 17'3" When I measure the width on the pool layout, the shallow end is 18' and the deep end is 16' The actual measurement between the hooks in the walls for the...
  5. jszotkie

    Actual size of freeform pool

    I am waiting for spring for completion of my pool. I have a question about the actual size of a freeform pool. I originally planned on a 16X36 freeform pool, but after it was marked out, I decided to go with 18X36 pool, at an increase of 2300.00. No one came out and re marked the dimensions...
  6. jszotkie

    Waiting for spring

    I saw one pool with colbalt color. It was a smaller size pool 15X32. The water was a little dark, but that's what the owner wanted. He said it helps warm the water. If I was to go with Ansylbrite, I would probably go with Sapphire color. I might just go with the white plaster for now and then...
  7. jszotkie

    Waiting for spring

    I have to wait until spring to have my pool finished. The contract was signed on 6/23/18. The hole was dug on 8/1/18 and steel was done on 8/2/18. Gunite was done on 8/24/18, and tile was done on 9/21/18. Fence was done on 10/29/18. All that is left is plaster. They wanted to do it Nov. 9th. I...