    Construction problem

  2. M

    Construction problem

    Thanks for help and advice. Basically I told them we wanted to go to a travertine tile for the patio and pavers for the decking. We offered up $2,000 and the pool Company is taking care of the rest. Spoke to an attorney and ripping out the coping comes with environmental issues apparently with...
  3. M

    Construction problem

    Thank you. We were disappointed because our patio sofa was going to be pushed out on the that area. I also have a big green egg that I move out just outside my overhang which is why when we did this that I had asked for everything to be on the same elevation. I am going to offer $2,000 to keep...
  4. M

    Construction problem

    Thank you. Technically they could rip the coping off, dowel in to the pool add a layer of rebar then raise it up. They would have to pull and re tile. This is what makes me mad. The fix would cost them $$$. All I did was ask that they pick up the up charge on the travertine. I have approx 975...
  5. M

    Construction problem

  6. 61E12AEC-48E3-44D2-9B2C-C4BD73241954.jpeg

    61E12AEC-48E3-44D2-9B2C-C4BD73241954.jpeg

  7. 667C5653-66EE-4BBE-B185-D78E3A5770CB.jpeg

    667C5653-66EE-4BBE-B185-D78E3A5770CB.jpeg

  8. DFF7DA4A-D993-454A-908F-4CB80AB2BF31.jpeg

    DFF7DA4A-D993-454A-908F-4CB80AB2BF31.jpeg

  9. M

    Construction problem

    Seeking advice. My PB put the pool in the ground three inches lower than it was supposed to be. This is a big deal because the coping is at the same elevation as my patio, which was supposed to get the same Tex Mat concrete as my pool decking. Everything would have been at the same elevation...