Hi all,
I set up my pool on Tuesday, filled it up and added the required CYA per pool math (8000 litres calls for 360g for a CYA of 45). At the same time I added the required bleach to get the chlorine level from 0 to 6. All is well, the water is clear (even after a big rain storm today) and...