Report:
Yesterday 6/3, started at 6a. Started pump. Brushed. FC was 1 and shocked to 12. Tested every 1 to 2 hours until 6pm. Throughout the FC dropped 2-3. Added more chlorine back to 12 every time. Last check was 8pm (FC was 10, added to 12). Pump was running all day. Tested CC only three...