We replastered the pool 31 May 11- filled that day. Installed a sand filter with zeosand, a two speed EcoPump EP-6, a Spectralight SL-500, a GE 15087 DPDT controller, and kept the RayPak 2100. Because we ripped out the old booster pump, I just switched from a Polaris 280 to a Polaris 360, which...