Search results

  1. JRB100

    (New) Spa Blower shuts off after five minutes

    I am stumped. I replaced my spa blower a few months ago with the same model (240v, 1hp, 2.6 amps). The blower runs for about five minutes and shuts off. I put in a bleed valve to divert some of the air pressure away from the spa return. That did not make a difference. I thought the outside...
  2. JRB100

    High Calc Hardness with SWG ?

    Has anyone faced having a SWG with high calcium hardness (~1000-1050)? It's taken me a long time to find a good place to install one due to having limited pipe. After my pool remodel three years ago, the guy that adjusted the chemicals added enough chem to get the hardness up to 900. I have...
  3. JRB100

    1998 Pool renovation underway (1/23/2020 Dallas)

    1998 pool/spa renovation underway. Demo starts today (1/23/2020). Plaster: micro mini pebble white (Finest Finish Quartz Fusion) Tile and trim tile: Fujiwa Pilos-406 Satin Pearl Coping/spa cap/spa spillway: leuders limestone with chiseled edge Spa veneer: light ivory ledger stone split face...
  4. JRB100

    DFW area folks - where to buy Sch 40 PVC fittings

    I will be rerouting some pool plumbing and need several different fittings of Schedule 40 PVC. I found a supplier out of Texas, but the shipping will run about $90. There is bound to be a retail store in the Dallas/Fort Worth area with what I need. Anyone in the DFW area have some leads...
  5. JRB100

    Heater bypass with A&A in-floor cleaning system

    My pool/spa is 21 years old with an A&A in-floor cleaning system. I have often had issues with the pop-ups not fully popping-up. I replaced all popups after four or five years (which helped greatly). I am replaced two last July and will replace many of the others in the next month. My...
  6. JRB100

    A&A in-deck Leaf Vac not repairable - replace or close it off ?

    The lock bar which holds the lid in place for my Leaf Vac (A&A, in-deck) no longer stays in place. A&A has advised that the LV should be closed-off or replaced. I now know having the LV installed in the deck was a big mistake. My question: should I close-off the LV and let the debris* go to...