We are having pavers installed over our existing concrete pool deck. We currently have regular anchors in the concrete for our pool cover. I read that we should use the tube anchors for pavers so I have a few questions.
* can I remove existing anchors and use existing holes for the tubes (just drill deeper)?
* my existing mesh cover needs replaced, am I better off just making new holes so we don’t have to worry about the anchor placement matching up? I currently have a Latham cover, but like to buy a Loop-loc one this time around.
* does anyone have specs on how big the holes need to be? I cannot find them anywhere for Loop-Loc anchor in tube.
* can we pre drill the holes in the concrete and just have paver installer drill pavers as needed during install? Or should it be drilled after pavers are installed
* can I remove existing anchors and use existing holes for the tubes (just drill deeper)?
* my existing mesh cover needs replaced, am I better off just making new holes so we don’t have to worry about the anchor placement matching up? I currently have a Latham cover, but like to buy a Loop-loc one this time around.
* does anyone have specs on how big the holes need to be? I cannot find them anywhere for Loop-Loc anchor in tube.
* can we pre drill the holes in the concrete and just have paver installer drill pavers as needed during install? Or should it be drilled after pavers are installed