Update 4/27/20222:
Finally decided on design and pool equipment. Submitted for Permit and it is now approved.
Working through getting bids and scheduling trades. Thank you to all that has helped so far.


Pool Equipment:
Pump: Pentair 3hp VSF 11056
Filter: Pentair 520 sq ft cartidge filter
Salt Water: Salt system- IC60
Heater: 400 Nat Max E Therm Black
Automation: INTELLICENTER I8PS POOL/SPA CONTROL
Lights: Pentair Microbrite (1 on baja step, 2 in pool, 1 in spa)
Autofill: MP Auto Fill Leveler
SILENCER BLOWER 1.5 HP, 220VOLT
Original:
I am new to this group but I have found so much useful information. I am still reading through all the important details of pool construction and additional reading for various sections so still lot for me to learn.
I am going to go owner build route in hopes to get my pool completed in time for the hot summer here in Arizona. I have been working with a consultant that will get all the required plans and engineering docuemnts for permit and contractors.
I do not have the list of all the proposed equipment since I have not decided on the final design but here is the first draft of the design. Are there any design issues that stick out on the intial design? Any feedback is appreciated and I will continue to update everyone I move along this journey.
Finally decided on design and pool equipment. Submitted for Permit and it is now approved.
Working through getting bids and scheduling trades. Thank you to all that has helped so far.


Pool Equipment:
Pump: Pentair 3hp VSF 11056
Filter: Pentair 520 sq ft cartidge filter
Salt Water: Salt system- IC60
Heater: 400 Nat Max E Therm Black
Automation: INTELLICENTER I8PS POOL/SPA CONTROL
Lights: Pentair Microbrite (1 on baja step, 2 in pool, 1 in spa)
Autofill: MP Auto Fill Leveler
SILENCER BLOWER 1.5 HP, 220VOLT
Original:
I am new to this group but I have found so much useful information. I am still reading through all the important details of pool construction and additional reading for various sections so still lot for me to learn.
I am going to go owner build route in hopes to get my pool completed in time for the hot summer here in Arizona. I have been working with a consultant that will get all the required plans and engineering docuemnts for permit and contractors.
I do not have the list of all the proposed equipment since I have not decided on the final design but here is the first draft of the design. Are there any design issues that stick out on the intial design? Any feedback is appreciated and I will continue to update everyone I move along this journey.
Attachments
Last edited: