- Nov 11, 2020
- 172
- Pool Size
- 14000
- Surface
- Plaster
- Chlorine
- Salt Water Generator
- SWG Type
- Pentair Intellichlor IC-40
Hey guys! Just ran my first test with my TF-Pro salt. My pool was filled for the first time 7 days ago. Been brushing 2-3 times per day. Builder was off schedule and pump/filter didn’t get up and running until 5 days after. The past week has been a little stressful for me considering the circumstances and being a first time pool owner. I’m including my test run a few minutes ago. I’ve added the suggested acid already which was only 14oz of 31.45% Baum, which was much less than I expected to add considering my ph. About to add the CYA using the sock method and add some liquid bleach. Anything else I need to do at this point? Thanks for the help!
==========================================
Vis-a-Vis Pool
------------------------------------------
Build Type: Plaster
Volume: 12000 gallons
------------------------------------------
Latest Test Result Summary:
FC: 0.0 (41 minutes ago)
CC: 0.0 (41 minutes ago)
pH: 8.2 (41 minutes ago)
TA: 80 (41 minutes ago)
CH: 350 (41 minutes ago)
CYA: 0 (41 minutes ago)
==========================================
==========================================
Vis-a-Vis Pool
------------------------------------------
Build Type: Plaster
Volume: 12000 gallons
------------------------------------------
Latest Test Result Summary:
FC: 0.0 (41 minutes ago)
CC: 0.0 (41 minutes ago)
pH: 8.2 (41 minutes ago)
TA: 80 (41 minutes ago)
CH: 350 (41 minutes ago)
CYA: 0 (41 minutes ago)
==========================================