Installed and ready for concrete collar and electrical 1
I

Installed and ready for concrete collar and electrical 1

This is after the excavation and install. Next steps are concrete collar, electrical, plumbing, backfill.
There are no comments to display.

Media information

Category
New Pool Builds
Added by
IA_Pool
Date added
View count
205
Comment count
0
Rating
0.00 star(s) 0 ratings

Image metadata

Device
Apple iPhone X
Aperture
ƒ/1.8
Focal length
4.0 mm
Exposure time
1/1600 second(s)
ISO
20
Flash
Auto, did not fire
Filename
IMG_7399.jpg
File size
3.1 MB
Date taken
Wed, 28 April 2021 4:23 PM
Dimensions
4032px x 3024px

Share this media