So, I now have my pump, SWG and filter... and the pool is on the way from the pool factory!! Thankyou to forum users for advice on these purchases.
I’m about to start prepping for this which will be a big job, and take a few months. I’m going to try and enjoy the journey (we’ll see if I’m still smiling in a few months...)
I have a ‘difficult site’. In the area I’m planning on installing the pool I have a 1:4.3 or 13.5 degree slope. Basically it’s going to suck. I’ve been measuring and planning and think I do have a game plan for this, but wanted to get some input and ideas from this forum to make sure I’m not missing any gotchas here... I want to do this right. Once
Once I have the first stage done, I may get a professional leveling and install for the pool itself, or may just take my time to get things properly level. For general earth moving and retaining walls, I have some guys to help me. I’m pretty sure I’ll be able to find a place for all the excavated dirt with the planned retaining wall etc. I currently own a plate compactor from a previous retaining wall project.
I’ve sketched out my plan below it 4 main phases:
Any and all advice appreciated!
Thank-you,
Novak
I’m about to start prepping for this which will be a big job, and take a few months. I’m going to try and enjoy the journey (we’ll see if I’m still smiling in a few months...)
I have a ‘difficult site’. In the area I’m planning on installing the pool I have a 1:4.3 or 13.5 degree slope. Basically it’s going to suck. I’ve been measuring and planning and think I do have a game plan for this, but wanted to get some input and ideas from this forum to make sure I’m not missing any gotchas here... I want to do this right. Once

Once I have the first stage done, I may get a professional leveling and install for the pool itself, or may just take my time to get things properly level. For general earth moving and retaining walls, I have some guys to help me. I’m pretty sure I’ll be able to find a place for all the excavated dirt with the planned retaining wall etc. I currently own a plate compactor from a previous retaining wall project.
I’ve sketched out my plan below it 4 main phases:
- compact excavator to dig out dirt to create a level area and drop the grade to 26” which is the max depth I can put the pool in ground. Here I will also level off the ground for 3’ outwards to try and minimize additional forces on the sidewall. I’ll put railroad ties/rebar there to act as a cheap and dirty retaining structure between the pool and the retaining wall I’ll later build. I will be digging out more than I need to install a French drain here also.
- The excavated dirt will be piled against the existing retaining wall (I may run a backup leach field for my septic at this time but this doesn’t affect the pool plans). Leveling can now begin and pool install can be completed. I’ll out a temporary but code compliant electrical outlet and filter, pump etc on pavers until I later move these into the shed. ( kids can start using the pool!)
- New retaining wall will be built, previously excavated soil moved downhill to backfill and compact
- Build deck ( deck may well end up smaller than shown due to current redwood prices!!)
Any and all advice appreciated!
Thank-you,
Novak
Attachments
-
FE85AE23-4950-433F-AFAD-52B961AFE715.jpeg315.6 KB · Views: 41
-
413AD329-0658-4869-B53D-740F186C10D1.jpeg315.7 KB · Views: 38
-
2A4E14F1-C5FD-401E-A8F7-670980345892.jpeg313.7 KB · Views: 36
-
009667B7-E498-4B6A-8B5F-527525070069.jpeg680.9 KB · Views: 37
-
FCF88829-6409-4ABD-92AA-B3AB1D74D994.jpeg682.4 KB · Views: 37
-
C7DC0292-3C72-43E2-A477-58EBE40A3C72.jpeg746.3 KB · Views: 36
-
9CDDA1CC-64BE-4E83-AE47-3E2DE8A3C29C.jpeg662.1 KB · Views: 41
Last edited: