It likes like our expansion joint is similar to the cantilevered decking @bdavis466 mentions in: Expansion Joints and Coping. If this is the case, how far under the decking does the mastic go? I can access the mastic above the tile line just fine, but wonder how far back wonder the decking the mastic will go. Am I able to remove the mastic and reapply in a uniform way or would it be suggested to plan to replace the coping?
 
Last edited by a moderator:
It likes like our expansion joint is similar to the cantilevered decking @bdavis466 mentions in: Expansion Joints and Coping. If this is the case, how far under the decking does the mastic go? I can access the mastic above the tile line just fine, but wonder how far back wonder the decking the mastic will go. Am I able to remove the mastic and reapply in a uniform way or would it be suggested to plan to replace the coping?
Welcome to TFP.

The mastic should just go 1/4”-1/2” into the gap.
 
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.