- Jul 16, 2019
- 691
- Pool Size
- 20000
- Surface
- Vinyl
- Chlorine
- Salt Water Generator
- SWG Type
- Hayward Turbo Cell (T-CELL-5)
When was your pool decking poured? When did they drill the holes for the loop loc inserts? Did they have any concerns about concrete curing between those two actions? How many days between concrete decking being poured and safety cover being put in place?
Just looked back through my threads - it was 3 weeks exactly from the deck being poured to the anchor drilling. Good question - I didn't even think about that! I *think* they say 30 days for full curing? Let's hope we got lucky somehow, as the damage is done..