28K plaster pool about 8 months old. Chlorine pool. I have been trying to keep my numbers at the TFP recommended numbers. I have to constantly add acid and Baking soda. My PH wants to climb to 8 and ALk wants to stay in the 60's. CH 315-320. CYA 35, FC 3 with the liquidator. I also have a Delta UV system.
It seems I can keep a PH around 7.8 and ALK about 65 pretty easily. Every time I try to get PH closer to 7.4 and Alk up higher it barely lasts 2 days. Water is clear and temp right now is around 84. I have had this issue all summer. My builder said I would have to add acid for about a year before it stabilized. He suggested getting Alk up high like 100+ and go from there. I am thinking of just letting it rock along with the lower ALK, as it makes the CSI closer to 0. I am getting tired of buying baking soda.Thoughts?
It seems I can keep a PH around 7.8 and ALK about 65 pretty easily. Every time I try to get PH closer to 7.4 and Alk up higher it barely lasts 2 days. Water is clear and temp right now is around 84. I have had this issue all summer. My builder said I would have to add acid for about a year before it stabilized. He suggested getting Alk up high like 100+ and go from there. I am thinking of just letting it rock along with the lower ALK, as it makes the CSI closer to 0. I am getting tired of buying baking soda.Thoughts?