Current status:
All of the tile is done except the spa spillway. The wall with the water features is done. Next up is finishing the coping, hopefully tomorrow. This week they will also frame up for the deck frame along with final plumbing connections to the P Trap and gas supply for the house.
Sent from my iPhone using Tapatalk