U need -
The loop around the pool 18-24” away from the pool wall & 4-6” deep
A water bond (usually in the skimmer via a plate or “bug”)
A pump bond
A swg bond
All these are to be tied together.
If the entire pool structure is non metallic - including the track around the bottom of the pool you are not required to attach the bond wire to the wall/track etc. according to the NEC.
If u are having it inspected some municipalities will still insist that u do the four points, so check on that since they are the ones who can pass or fail u (even if its wrong or makes no sense)
You must comply with the version of the code that they enforce.
Here’s a good synopsis of 2014 NEC requirements