Line 2: | Line 2: | ||
If you are building your pool here are things to discuss with your builder and contractor.<ref>https://www.troublefreepool.com/threads/design-your-dream-pool-pad.184681/</ref> | If you are building your pool here are things to discuss with your builder and contractor.<ref>https://www.troublefreepool.com/threads/design-your-dream-pool-pad.184681/</ref> | ||
+ | *Consider location carefully. Many Pool Builders will put the equipment where it is convenient for them | ||
*Size - 5’ x 10-12’+ | *Size - 5’ x 10-12’+ | ||
*Pumps on one side, filter in the middle and heater on the other side. | *Pumps on one side, filter in the middle and heater on the other side. |
Revision as of 14:35, 14 September 2019
What are the Best Practices for a Pool Equipment Pad?
If you are building your pool here are things to discuss with your builder and contractor.[1]
- Consider location carefully. Many Pool Builders will put the equipment where it is convenient for them
- Size - 5’ x 10-12’+
- Pumps on one side, filter in the middle and heater on the other side.
- No pipes coming up through concrete, bring them up through crushed stone.
- All valves & pipes labeled for function and flow direction
- Room to move around, put your feet between equipment, and get behind all equipment
- Control panels on something solid like a structure wall or a wall created by posts and 2 x 10’s.
- Good airflow
- Consider where heater exhaust will blow to
- Protection from sun or at least spray paint pipes
- Light overhead for night work
- 120V GFCI receptacle
- Water spigot
- Drain area or to sewer for waste
.