We had our new 18x34 agp buried about halfway back in March/April.
We're now ready to start our deck build. The rains have been almost non-stop, so our back yard has basically been a beautiful pool surrounded by a giant mud pit.
I thought it would be fun to document this process as well.
Here are a couple of before pics:


The first is right after installation, the second is to show how we've been making do with our temporary foam mat walkway.
Here is one while we were working with the nasty clay, to ensure that all water would drain away from both the house and the pool.

And finally today, here is where we have finished the dirt work and roughly pre-planned our footer locations.


Sent from my HTC6435LVW using Tapatalk
We're now ready to start our deck build. The rains have been almost non-stop, so our back yard has basically been a beautiful pool surrounded by a giant mud pit.
I thought it would be fun to document this process as well.
Here are a couple of before pics:


The first is right after installation, the second is to show how we've been making do with our temporary foam mat walkway.
Here is one while we were working with the nasty clay, to ensure that all water would drain away from both the house and the pool.

And finally today, here is where we have finished the dirt work and roughly pre-planned our footer locations.


Sent from my HTC6435LVW using Tapatalk