My last work has lasted for about 5 years. Short of redoing the whole pool plumbing I want to redo my equipment pad with some upgrades. VS speed pump. New filter and a heat pump. As of today I have plastic barbed connections going into the original/existing plumbing. I found the drips at a few connections and I wanted some feedback on how I can do it better. Thanks in advance.