Hi all,
This forum is a great resource, and my first time posting. I live in Michigan and having an vinyl liner inground pool installed now. I will have backfill by 10/10/20, it’s a number 2 sand that is being brought in. For those that had sand/dirt backfill, how long did you wait before pouring concrete? Don’t want to rush it and may wait till Spring, but would also like to wrap this project up this year if the weather cooperates. It gets cold here in mid November. Thanks in advance for your input.
I am thinking 4 weeks before pouring per a couple pool installers in my area, and I will water in the dirt religiously. I only have a 2 ft over dig. If you waited 4 or 5 weeks, did you have any issues with your concrete?Thanks again!
This forum is a great resource, and my first time posting. I live in Michigan and having an vinyl liner inground pool installed now. I will have backfill by 10/10/20, it’s a number 2 sand that is being brought in. For those that had sand/dirt backfill, how long did you wait before pouring concrete? Don’t want to rush it and may wait till Spring, but would also like to wrap this project up this year if the weather cooperates. It gets cold here in mid November. Thanks in advance for your input.
I am thinking 4 weeks before pouring per a couple pool installers in my area, and I will water in the dirt religiously. I only have a 2 ft over dig. If you waited 4 or 5 weeks, did you have any issues with your concrete?Thanks again!