Sent PB a question concerning the method of an extended beam installed, in which they basically just drove rebar into the ground. Since I am not an idiot I know that this is not an acceptable practice in terms of the ACI. I got the general "blah blah I am a pool builder for XX years and if you dont trust me blah blah blah tell me what you know about pool building that I dont". First off, besides being really surprised by the comment back, just trying to have a civilized conversation. Any like most pool builders the draw schedule is not owner friendly so telling him to pound sand isn't my best choice either. Is there any need for me to be concerned about this installation method? Hindsight not sure how much more risk there is here considering I agree with his answer on the rebar at perimeter sticking out every so often for the electrical grounding cable to connect to. If this rebar can be exposed as a place for rust to penetrate into the gunite shell, then how is it any different than the extended beam?
Attachments
Last edited by a moderator: