My pool issues have been well documented but I still have one issue that remains. When the PB completed my pool, they filled it up and came back in 10 days to add salt. During this time I brushed twice daily, sometimes more. During this time the pool water was not treated and began to scale. I have polished Hydrazzo and it went from silky smooth to rough. Part of building a pool one would assume would be to ensure that the water is balanced at least once before the PB walks away, is this the experience you all have had or did your builder tell you the pool is full of water now and you must immediately begin treating it? Mine did neither and I had to drain and refill the pool at a cost of $500 so that the surface could be repolished. My wife thinks I should send this water bill to the builder as she believes that as part of start up the pool should have been balanced.
Thanks for the input.
Thanks for the input.