Hello! We are in the middle of our build on Florida's Space Coast and the PB just finished grading the yard in preparation for the pool deck. Our yard is about an acre and has a relatively significant slope in the back yard( significant for Florida, anyway). From the house to the back of the deck is about a 3 ft difference. The original owners told us they basically ran out of money so they did not bring in any more full dirt at that point.
Anyway, what do you think of this drop off? We've already brought in 10 truckloads of dirt in addition to keeping all of the dirt that was excavated from the dig. We will have a paver deck and screen enclosure that goes roughly to the ends of the mound. Are we going to need a retaining wall?
They do not have any more dirt delivery scheduled and are about to pick up the bobcat for another job.
We are responsible for paying for the full dirt so I am wondering what is more cost effective- more dirt or a retaining wall? Or do you think we will be ok once we put sod down to keep the erosion at bay?
Here are some pics.


Anyway, what do you think of this drop off? We've already brought in 10 truckloads of dirt in addition to keeping all of the dirt that was excavated from the dig. We will have a paver deck and screen enclosure that goes roughly to the ends of the mound. Are we going to need a retaining wall?
They do not have any more dirt delivery scheduled and are about to pick up the bobcat for another job.
We are responsible for paying for the full dirt so I am wondering what is more cost effective- more dirt or a retaining wall? Or do you think we will be ok once we put sod down to keep the erosion at bay?
Here are some pics.