Process and Supplies Needed for Initial Fill

CBerger02

Active member
Aug 10, 2023
36
Currituck, NC
Pool Size
14500
Surface
Vinyl
Chlorine
Liquid Chlorine
I'll be looking at filling up our new 18x33 hard sided AGP in the spring and wanted to get a ballpark idea of what amount of supplies I'll need to get everything going and chemistry stabilized. I understand it is probably impossible to give a precise estimate because of so many variables, but I'd like to have most of what I need before I start putting water in the pool. It will probably take 4-5 days to fill (13-14kgal) based on the flow rate from my hose bib (will be using city water) and not wanting to fill overnight.
 
I have read those already. I am trying to determine how much bleach, cya, and muriatic acid I'll need on hand.
Are you using PoolMath?

You need enough liquid chlorine for 3-4ppm/day

Enough stabilizer to raise your CYA to 30ppm

How much muriatic acid depends on the pH and TA of your fill water. Start with 1 gallon of 31% MA.

How many days of liquid chlorine you stock is your decision.
 
Thread Status
Hello , This thread has been inactive for over 60 days. New postings here are unlikely to be seen or responded to by other members. For better visibility, consider Starting A New Thread.