Re: Pool Build - California Dreaming - Still Dreaming......
Spillmar - sounds like you've got it covered (pun intended). I watched our turf install and the prep work was the most intensive and longest part of the process - and of course the most important with proper packing and pitching of the DG. After that it kind of is like carpet - roll it out and nail it down on 4" square pattern. Ours was a bit easier though as we didn't have a lot of seams. I think the sand was a good choice for your application. It'll look great and function well for you I'm sure :thumbs up:
Spillmar - sounds like you've got it covered (pun intended). I watched our turf install and the prep work was the most intensive and longest part of the process - and of course the most important with proper packing and pitching of the DG. After that it kind of is like carpet - roll it out and nail it down on 4" square pattern. Ours was a bit easier though as we didn't have a lot of seams. I think the sand was a good choice for your application. It'll look great and function well for you I'm sure :thumbs up: