I'm just about done leveling the area for our 18'x48" INtex ultra frame and i am picking up the materials for the bottom this afternoon.
I've got he pavers for under the feet, so im set there.
What else do i need besides the pink foam and the duct/gorilla tape (hold pink sheets together)? Do i really need another tarp besides the one that came with the pool?
Side question once the pool is filled. I dug out and leveled a 20' area for a 18' pool. All said and done i should have a 1' or slightly less boarder around the pool. The deepest part of the dig out is about 5-6". Would it be to risky to fill that 1' area with that rubber mulch stuff, particularlay where the pool bottom goes 5-6" below the ground?
I've got he pavers for under the feet, so im set there.
What else do i need besides the pink foam and the duct/gorilla tape (hold pink sheets together)? Do i really need another tarp besides the one that came with the pool?
Side question once the pool is filled. I dug out and leveled a 20' area for a 18' pool. All said and done i should have a 1' or slightly less boarder around the pool. The deepest part of the dig out is about 5-6". Would it be to risky to fill that 1' area with that rubber mulch stuff, particularlay where the pool bottom goes 5-6" below the ground?