Our pool was just replastered with Wet Edge quartz based plaster on October 26. We have been brushing and balancing since. Tomorrow the pool folks come to close the pool for the winter. I have been working hard but trying not to cause extreme changes in water chemistry, but the pH is as low as I can bring it, the Alkalinity is still to high and the CSI close to too low:
FC. 2
CC. 0
pH. 7.2
CH 275
Alkalinity 110
Temp. 50F
CSI. -0.55
can anyone lend some advice on what I can do to adequately prepare for the closing and winter? I tried to call WetEdge but of course they are closed this week.
FC. 2
CC. 0
pH. 7.2
CH 275
Alkalinity 110
Temp. 50F
CSI. -0.55
can anyone lend some advice on what I can do to adequately prepare for the closing and winter? I tried to call WetEdge but of course they are closed this week.