Well after almost 2 years of planning, designing, saving and doubting, we finally broke ground last week. First there was some demo work on an existing piece of patio on Tuesday, then dug on Wednesday and rebar on Thursday. The plan for Monday is to finish rough-in and fix the leading edge of the tanning ledge (needs to move back about 3”). Shotcrete shoot is scheduled for Tuesday at 10:30. However, well before last week, I spent a good bit of time laying out the outline, which consisted of:
So here are the details of the build along with plans (no dimensions for clarity) and pictures below of the progress so far.
530 sq. ft. (14,350 Gal.) Chlorine + Ozone Shotcrete Pool w/ Spray-Deck Decking, Flagstone Coping, Waterfall and Slide
Pool & Coping
























- Constructing reference boards in a cross pattern off the edges of the house
- Using reference boards to mark 20 arc center points and 2 start/end points of each arc
- Spraying 20 arcs and 10-12 various other reference points for benches, rock areas, etc.
So here are the details of the build along with plans (no dimensions for clarity) and pictures below of the progress so far.
530 sq. ft. (14,350 Gal.) Chlorine + Ozone Shotcrete Pool w/ Spray-Deck Decking, Flagstone Coping, Waterfall and Slide
Pool & Coping
- Shotcrete Pool Shell w/ Diamond Brite Plaster
- Tanning Ledge, Bench Seat @ Waterfall Wall, Bench Seat near Tanning Deck, Bench Seat in Deep End
- 6” Ceramic Tile @ Water Line (~100 linear ft.)
- Multiblend Flagstone Coping (~115 sq. ft.)
- Demo and removal of 200 sq. ft. of existing concrete patio
- 5" thick concrete decking with metal wire reinforcement and Spray-Deck (Egg Shell) surface (450 sq. ft.)
- Spray-Deck Addition to Existing Concrete Patio (430 sq. ft.)
- Install Customer-Supplied (8) 2" Umbrella Sleeves in new decking (3) 2" Umbrella Sleeves in existing concrete (prior to adding Spray-Deck), (5) 2" Umbrella Sleeves in pool, and (1) Anchor Tube in new decking for basketball goal
- 5.5 ft. high x 5 ft. wide Rock Waterfall (Creek Rock, Moss Boulders, Moss Builders, Flagstone, etc. but No Plants or Mulch) extending down into pool
- 21" High x 12" Wide Left Rock Wall and Right Rock Wall w/ Moss Builders extending down into pool.
- Sloped Front Rock Wall (providing 12" high railing on outside of Steps with natural irregular slope)
- Sloped Back Rock Wall (providing 12" high railing on outside of Steps with natural irregular slope)
- Rocks for Slide Steps: Small Creek Rock for Vertical Side. Flagstone Treads for Horizontal Side.
- Moss Builders extending down into pool at 2 Planters ”Eyes” in decking
- Backfill and Shotcrete for Waterfall & Slide
- Dolphin 15'-6" Right Turn Slide
- (2) Pentair (Sta-Rite) IntelliPro XF VS Pumps w/ Union Connectors
- Pentair CCP520 Filter
- Pentair 521213 IntelliTouch Load Center (customer to provide 100A supply for tie-in)
- Pentair 521223 i5+3S Personality Kit
- DEL Ozone EC-20 (w/ injection manifold)
- Pentair R171096 Rainbow 300 Off-Line Chlorine Feeder
- Pentair 520500 ScreenLogic2 IntelliTouch and EasyTouch Systems iPhone/PC Interface Kit
- (5) Jandy 2", 2-Way Valves (Model 4716)
- (1) Jandy 2”, 3-Way Valve (Model 4717) w/ Intermatic PE24VA Valve Actuator
- (3) FlowVis 2.5" x 2" Flow Meters/Check Valves (Model FV-C)
- Concrete pad (18'-10" x 3'-2" x 5") for pool equipment & storage
- Dolphin S300i Robotic Pool Cleaner
- (3) Pentair Intellibrite 5G LED Pool Lights
- (2) Pentair GloBrite LED Lights
- (4) VOLT Underwater Forged Brass Lights for Waterfall
- (3) VOLT Top Dog Brass Downlights for Steps mounted on stone railing up to slide
- 50' of 12 Gauge Underground Rated Low Voltage (12V) Wiring routed to "Eyes" for future landscape lighting tie-in.
- 75' of 10 Gauge Underground Rated Low Voltage (12V) Wiring routed to Junct. Box, then to Planters for future landscape lighting tie-in. Provide access to Junct. Box near bottom of Back Wall for future palm tree lighting tie-in.
- (2) Skimmers w/ 10" Skimmer Kit by PourALid
- (6) Pool Returns
- Dual Main Drain, Waterfall Suction & Return Lines, Slide Return Line w/ (1) Jandy 2" Check Valve
- Slide Wash Line w/ (1) 1" Check Valve connecting to irrigation valve
- (1) Hose Spigot taken off Slide Wash Line
- (1) Pentair T40-FBK Auto Fill/Leveler (Black), w/ (1) 1" Check Valve tied into irrigation valve
- 190 ft. of 4", SDR35 PVC piping & associated fittings
- 6 ft. of 6", SDR35 PVC piping & associated fittings
- Four (4) NDS 12" x 12” Catch Basins w/ Flat Grate
- Two (2) NDS 9" x 9” Catch Basins w/ Flat Grate (in Planters)
- Three (3) 4” Hidden Drains by PourALid (near Tanning Ledge)
- Provide drain on equipment pad for future heat pump
- Outdoor shower near equipment pad