Hello everyone im new here. Last year i had a buddy excavate an area of my sloped yard to put a pool in. I installed the pool and enjoyed it last summer. This year i want to finish it up and build a deck around it. I had him dig the area slightly lower than the low part of the yard as i wanted the top of the pool even with a 3 seasons room and a deck that i plan to build. One side of the pool is roughly 22 inches lower than the yard. I had him dig the hole extra big so i could move it around while building bacause i wasnt exactly sure where i wanted it. Now i need to backfill the pool and not too sure how to do it properly. We have clay soil and it is allmost solid clay down there. Any help would be appreciated. Im worries if i backfill with soil the pool will rot out. It is all metal. Any suggestions? I tried to attach some images but every pic i rries it said "the uploaded file is too large for the server to ect"