Just installed this pool last weekend. It's an intex ultra frame 32x16x48" so I'm assuming the size stretches the limits of the saltwater cell.
Pool was full on Saturday and saltwater system was producing free chlorine Saturday night. I added shock and algaecide to start with and ordered some stabilizer. I've ran the saltwater cell about 12 hours a day for the past 2-3 days.
Fast forward to today and I'm still down at .6ppm. I just added the 40ppm of stabilizer which I'm sure will help and it's been very hot and sunny for three days.
I'm worried if I don't get the chlorine dialed in quicker It will start to have issues. Question is should I:
A: Shock once more
B: Use chlorine to avoid any of the shock chemicals I don't necessarily need
C. Take the risk and keep running the saltwater cell overtime hoping it eventually catches up.
D. Some other cool plan I haven't thought of.
Thanks for the help!
Pool was full on Saturday and saltwater system was producing free chlorine Saturday night. I added shock and algaecide to start with and ordered some stabilizer. I've ran the saltwater cell about 12 hours a day for the past 2-3 days.
Fast forward to today and I'm still down at .6ppm. I just added the 40ppm of stabilizer which I'm sure will help and it's been very hot and sunny for three days.
I'm worried if I don't get the chlorine dialed in quicker It will start to have issues. Question is should I:
A: Shock once more
B: Use chlorine to avoid any of the shock chemicals I don't necessarily need
C. Take the risk and keep running the saltwater cell overtime hoping it eventually catches up.
D. Some other cool plan I haven't thought of.
Thanks for the help!