Builder hasn't been back to see the end result of the plumbing yet, but so far he's ignored my other plumbing concerns without actually looking directly at the issue, which was already covered in dirt.
So I'm reaching out to everybody here to see if this is going to be an issue in the long term. The pipes were installed at angles and are currently hovering above the soil, so I'm concerned about long term stress loads after backfilling, decking, and future soil movements. I don't think the pictures do it justice, but is this a valid concern?
So I'm reaching out to everybody here to see if this is going to be an issue in the long term. The pipes were installed at angles and are currently hovering above the soil, so I'm concerned about long term stress loads after backfilling, decking, and future soil movements. I don't think the pictures do it justice, but is this a valid concern?