Just wanted to formally introduce myself. I'm Donna from South LA. We are currently in the middle of our construction. We were pushed back a week due to rain, dig was on Wednesday, April 22nd. Gunite was sprayed on Friday, April 24th. We are now waiting on tile, which is on backorder. Hopefully it will be in today. I'm so nervous and ready to get this job completed so we can start having fun 
Pool will is 16X30 saltwater, Gunite, with 4 ft waterfall, tanning ledge with umbrella sleeve.
I've been reading, so I'm ready to join to learn and share this experience with all of you!
Pool will is 16X30 saltwater, Gunite, with 4 ft waterfall, tanning ledge with umbrella sleeve.
I've been reading, so I'm ready to join to learn and share this experience with all of you!