Custom Design Free-form Swimming pool
97' Perimeter pool 36' x 22' 568' Sq. ft. Surface area
Gunite Concrete Shell # 3 - # 4 1/2 steel
Schedule 8*' on Center Box Beam foundation
Finish Bullnose Travertine Coping Columns Beams
Lifetime Warranty
Excavation
52 day build time start to finish
Remove Section of wood fence & replace for tractor access
Equipment Series 745 Excavator
Pre-grade & set elevations
Building & Engineering plans
Community Association approval
Tri-Level Entrance w/ Extended Bench
Depth 3.5'.. - 6.0'
6" Tile line
2 LED Color Pool Lights
Interior step-out bench in Deep End
Wet-Edge® Level 1 Pebbles interior Finish
Hydro Spa.. 8' ft.
Luxury Spa Package
Stack stone spillway w/ Split-face Veneer travertine wrap
Elevated 18"
1" X 1" Glass Tile Rolled Edge
Wet-Edge® Level one interior Finish
LED Color spa light
400,000 BTU Universal Heater
1.5 hp. Air Blower...........Included w/spa
VS Omni Wireless remote Via Internet Smartphone
Omni Logic Video Controller by Hayward
Special Feature
2 Pilasters w/ up to +18" Raised Bond Beam 3 Scupper water Features
w/1.5 hp. Water Feature Pump
Concrete Decking
1.050' Sq. ft. 4" Reinforced Concrete w/ Acrylic Kool Deck Finish Design
120' Sq. ft. Top Coat Acrylic Koll deck Finish on Existing Covered Patio
*******Deck and Area Drains included towards Street *******
Equipment Package:
*SwimClear™ Multi-Element Hayward Pool Equipment Information
*2.7 hp. Variable Speed Circulation pump Eco star Pump Video
*C450 Cartridge Filter
*Robotic Shark Pool Cleaner Shark Vac Video
*Dual Port skimmers
*7 Return Lines w/ in-Line Hayward T-Cell 15 Aquarite Salt Systems
* Anti-Vortex VGB Rated Drain
* Schedule # 40 PVC Plumbing w/ Electric Actuators
* Equipment pad reinforced 4" concrete w/ overhead light & GFCI Outlet
Project includes:
All Electrical runs
All Gas Line w/ Hook-up to Equipment
Advanced Dedicated lines
Dual Port skimmers and Anti-Vortex Main Drain
Overflow release & Autofill line
Yard Clean up
Start Up Orientation Super test Kit
Telescope net and Brush
Owner's Manual
Glad I came across this forum. It's helped a ton when speaking with different PB's while getting quotes. Here is a builder's package that we've pretty much settled on. They have been the most responsive while being reasonably priced.
I wanted to get everyone's thoughts on the equipment below.
Custom Design Free-form Swimming pool
97' Perimeter pool 36' x 22' 568' Sq. ft. Surface area
Gunite Concrete Shell # 3 - # 4 1/2 steel
Schedule 8*' on Center Box Beam foundation
Finish Bullnose Travertine Coping Columns Beams
Lifetime Warranty
Excavation
52 day build time start to finish
Remove Section of wood fence & replace for tractor access
Equipment Series 745 Excavator
Pre-grade & set elevations
Building & Engineering plans
Community Association approval
Tri-Level Entrance w/ Extended Bench
Depth 3.5'.. - 6.0'
6" Tile line
2 LED Color Pool Lights
Interior step-out bench in Deep End
Wet-Edge® Level 1 Pebbles interior Finish
Hydro Spa.. 8' ft.
Luxury Spa Package
Stack stone spillway w/ Split-face Veneer travertine wrap
Elevated 18"
1" X 1" Glass Tile Rolled Edge
Wet-Edge® Level one interior Finish
LED Color spa light
400,000 BTU Universal Heater
1.5 hp. Air Blower...........Included w/spa
VS Omni Wireless remote Via Internet Smartphone
Omni Logic Video Controller by Hayward
Special Feature
2 Pilasters w/ up to +18" Raised Bond Beam 3 Scupper water Features
w/1.5 hp. Water Feature Pump
Concrete Decking
1.050' Sq. ft. 4" Reinforced Concrete w/ Acrylic Kool Deck Finish Design
120' Sq. ft. Top Coat Acrylic Koll deck Finish on Existing Covered Patio
*******Deck and Area Drains included towards Street *******
Equipment Package:
*SwimClear™ Multi-Element Hayward Pool Equipment Information
*2.7 hp. Variable Speed Circulation pump Eco star Pump Video
*C450 Cartridge Filter
*Robotic Shark Pool Cleaner Shark Vac Video
*Dual Port skimmers
*7 Return Lines w/ in-Line Hayward T-Cell 15 Aquarite Salt Systems
* Anti-Vortex VGB Rated Drain
* Schedule # 40 PVC Plumbing w/ Electric Actuators
* Equipment pad reinforced 4" concrete w/ overhead light & GFCI Outlet
Project includes:
All Electrical runs
All Gas Line w/ Hook-up to Equipment
Advanced Dedicated lines
Dual Port skimmers and Anti-Vortex Main Drain
Overflow release & Autofill line
Yard Clean up
Start Up Orientation Super test Kit
Telescope net and Brush
Owner's Manual