You're late with both pH and FC adjustments.My CL has fallen to 1
pH was at 8.2
Time to add my first bleach?
You're late with both pH and FC adjustments.
First, lower the pH to 7.2ish, re-test to confirm, then add enough bleach/liquid chlorine to reach 10 ppm FC.
Based on CYA of 80, keep the FC between 6 and 11, and never below 6. Hop to it![]()
Half an hour is usually plenty of time for things to mix before you retest. But since you weren't off the scale, if you added the correct amounts, there's no reason to check again so soon. Once every 24 hours is plenty.It's been about 12 hours since I put in the muriatic acid and chlorinating liquid. I'm test FC and pH now, is that an acceptable time period to wait?
Half an hour is usually plenty of time for things to mix before you retest. But since you weren't off the scale, if you added the correct amounts, there's no reason to check again so soon. Once every 24 hours is plenty.
You eyes are not designed to focus underwater with no goggles, so it always looks cloudy/blurry. The CH should not impact the clarity.
The CYA will only drop when you physically remove water. So how fast that happens I suppose depends on the amount of rain that you get and thus have to pump off water.
Then it is going to take a LONG time for nature to lower your CYA.