Just wondering if there are any issues in putting our equipment pad behind the pool shed between it and the fence? It would be about 4-5 ft wide by 8 ft long. Is this enough space to work with? Also, any issues in running the pvc piping under the shed on its way to the pool? I don't want it to be a major pain if we ever need to get to the pipes (maybe we never would need to?) Thanks!