Wanted to get your input as I have never worked with plumbing like this. Any issue with the shown layout? 2 returns on left and 4 to pump (2 skimmers, vacuum port, and main drain). Put some stuff vertically like sacrificial anode, turbo (electrolytic) cell, then flow switch. All this is about 13’ from nearest pool wall and I used 1.5” schedule 40 piping.
Thanks for your input!
Thanks for your input!