We are on day two of our 24ft round shark line/Wilbar pool. Feel like we did a great job preparing the site as everything was with in a 1/2 inch around the outside.
we got the wall up and I the track and we’re able to match the connecting bolts on the first try...was pretty stoked about that.
today we finished the base and installed the liner, however the metal top rail/
Stabilizer bar is like 6 inches too long.
we triple checked every connection and none of the joints can go any tighter...
Will this stretch into position as we fill?
Or should I just slice off the extra and get it installed?
we got the wall up and I the track and we’re able to match the connecting bolts on the first try...was pretty stoked about that.
today we finished the base and installed the liner, however the metal top rail/
Stabilizer bar is like 6 inches too long.
we triple checked every connection and none of the joints can go any tighter...
Will this stretch into position as we fill?
Or should I just slice off the extra and get it installed?