Today I needed to add 16# of balance pack 100, then after 2 hours add 1 gallon of Muratic acid.
I had 2 additional gallons of Muratic Acid to add tomorrow, in between Optimizer Plus and I was to split this into 3 separate doses each 8 hours apart....well he just went out there & dumped in the 2 gallons of Muratic Acid. Meaning the 22,500 gallon pool just got 3 Gallons of Muratic Acid all within a few hours. I know that the Maximum dose of Muratic Acid is 1pt per 10,000 gallons every hour, What do I do now? Should I just start by adding some of the Optimizer Plus even though that was supposed to go in BEFORE the Muratic Acid???
I am freaking out a bit here, and obviously the store is no longer open.
HELP!!
I had 2 additional gallons of Muratic Acid to add tomorrow, in between Optimizer Plus and I was to split this into 3 separate doses each 8 hours apart....well he just went out there & dumped in the 2 gallons of Muratic Acid. Meaning the 22,500 gallon pool just got 3 Gallons of Muratic Acid all within a few hours. I know that the Maximum dose of Muratic Acid is 1pt per 10,000 gallons every hour, What do I do now? Should I just start by adding some of the Optimizer Plus even though that was supposed to go in BEFORE the Muratic Acid???
I am freaking out a bit here, and obviously the store is no longer open.
HELP!!