Fort Worth, TX New Pool Build (North Texas)

Bauer600

Well-known member
Sep 12, 2020
52
Fort Worth
So, tell me more about the spraydeck. Did they just spray over the concrete? Is it heat resistant?

It's suppose to keep the deck cooler, I wouldn't say heat resistant, but ours was a 3 day process. (Power wash/acid wash) then they put a slurry coat over existing concrete. Next step is a base coat layer that they paint and seal with the base color, and then in our instance with the multi color they then user a hopper and spray the other two colors on top to give it that aggregate look.
 

Bauer600

Well-known member
Sep 12, 2020
52
Fort Worth
Wet Edge Cadet Blue Plaster on 7/7 Acid Washed on 7/8 Filled on Thursday evening finished Saturday morning 7/10. We returned home on 7/12 and the pool was 102 degrees. They test fired the heater and forgot to turn it off Hope all will be well. They also threw in a Polaris, which never ran that I pulled as I told them numerous times we’re doing a robot. PB isn’t as keen as following the wet edge startup guide to the tee with the pebble as much as they would be with the Primera Stone he mentioned. We got in it when we returned on Tuesday the 11th. Still have mastic to do a d finishing the firepit.
33850F18-A7B5-4159-B6A9-610A62B165EB.jpeg9FDF9F8B-A219-4E7A-A2E6-BB7F27EF441B.jpeg447A721C-7E5A-47E9-990E-4A37B76CA9D4.jpeg1F959768-3056-4A58-84AB-8522BFE28C03.jpeg
 

Enjoying this content?

Support TFP with a donation.

Give Support
Thread Status
Hello , This is an inactive thread. Any new postings here are unlikely to be seen or responded to by other members. You will get much more visibility by Starting A New Thread