I just learned of the need for a flow switch - our installer didn't put one in. I've bought one and want to get it in the correct sequence. I understand I need ~12" straight flow ahead of the switch. Is the correct sequence:
1. Heater -> check valve -> flow switch -> SWG -> pool, or
2. Heater -> check valve -> SWG -> flow switch -> pool, or
3. Other?
I've got a fairly straight run from heater to SWG right now, so can likely fit either way. Thanks!